- Small plans that are double track lines (No. 4) Add a piece of crossover!
- Now on sale in May 2011, (HO) following the freight train starter set DD51,
We introduced a new line set group HO!
- The original Model Train [fun run], and to give you a taste of feel of HO gauge,
Uni assorted tracks we have the basic HO track.
- Pricing has become so affordable, user pro-development but also from the N Gage
Is also recommended for anyone who wants to start a model railroad now.
- The set of all instruction manuals (Quick Starter Guide) that preceded it, even for Beginners
You can taste the joy of the HO gauge easily.
- HV-electric four-point set of numbers who went 3-wire connecting the inside and outside of the endless double-track lines, more crossover
Is set.
- Removed unnecessary line accessories sold separately from the fourth point, which is configured over a dedicated line for more
, To align the insertion length of time is endless, the S246 and S114 comes with a straight
, And can be installed more easily point to the endless double track crossing.
- Multi-line spacing is standard 60mm Uni HO track, smart appearance and internal points of the ballast machine
Joyner comes with insulation so that electrical isolation between the multi-line has become, inadvertently points
Short in preventing conversion.
- Operation of the switch points, while the two points a straight line (double track), the curve (over) to select the
You can.
- Packing
Electric four-point numbers (left) × 2, S61L × 2 comes with straight lines, S246 × 2 straight lines, S114 × 4 straight lines,
Joyner × 2 Isolated, Point Switch × 1, × 1 branch connector
- HO Uni-track, the vehicle you wish to run HO gauge easily] was a desire to achieve, and the real
The HO gauge track was assembled with ballast for both ease of use.
- Consolidated reliable, affordable electrical wiring, may run stable, durable, realistic looking, excellent potential for growth
With features such as, easy to handle satisfying feel proud of the fans from beginners to veterans
The.
- Floor layout, as well as a wide range of full-scale module layout fixed layout
Be used.
( This is a machine translation. Please allow for possible misinterpretations in the text. )